Tuan Chau Express III High-Speed Ferry

Tuan Chau Express III is a high-speed passenger catamaran in the Tuan Chau Express fleet developed by Havaco Investment Joint Stock Company. It was constructed by Shipbuilding Company 189 in Hai Phong and handed over on 13 May 2020. The vessel was introduced with a design capacity of 300 passengers, an aluminium-alloy hull, Rolls-Royce propulsion equipment and a reported maximum speed of 28 knots.

The vessel is associated with the development of high-speed passenger links from Ha Long and Van Don to Co To Island.

Construction and Entry into Service

On 13 May 2020, Shipbuilding Company 189 delivered Tuan Chau Express I and Tuan Chau Express III to Havaco in preparation for the Tuan Chau – Co To and Van Don – Co To services.

On 24 May 2020, the two ferries participated in the inauguration of the high-speed connection between Tuan Chau, Ha Long and Co To Island, expanding transport options for visitors to the Quang Ninh archipelago.

Technical Specifications of Tuan Chau Express III

Specification Details
Vessel name Tuan Chau Express III
Investor Havaco Investment Joint Stock Company
Shipbuilder Shipbuilding Company 189
Year delivered 2020
Delivery date 13 May 2020
Type High-speed passenger catamaran
Hull material Italian aluminium alloy, as reported at introduction
Length 33.68 m
Beam 9.6 m
Design capacity 300 passengers
Business-class seating 18 seats in the original configuration
Propulsion equipment Rolls-Royce
Reported maximum speed 28 knots

These details were announced around the 2020 delivery. A vessel-specific IMO or MMSI number has not been independently verified for publication in this profile.

Catamaran Design and Passenger Comfort

Tuan Chau Express III features a twin-hull configuration offering spacious passenger areas and an open deck arrangement. The lightweight aluminium-alloy hull helps resist corrosion in the marine environment, while the catamaran configuration can contribute to stability under appropriate operating conditions.

Havaco introduced the Tuan Chau Express series with air-conditioned passenger cabins, padded reclining seats, noise-reducing floors and a business-class section equipped with individual entertainment amenities. Actual facilities can vary with refits and operational changes.

Historical Routes

Tuan Chau Express III was associated with passenger connections on:

  • Tuan Chau (Ha Long) – Co To.
  • Van Don – Co To.

Havaco later expanded its Quang Ninh services, including the Ao Tien – Co To connection. However, the wider fleet’s schedule is not proof that this vessel is assigned to any particular departure. Always confirm the ferry name and boarding port when booking.

Differences Between Tuan Chau Express I, II and III

Tuan Chau Express I and III were handed over on the same date, 13 May 2020, and were associated with the 24 May 2020 inauguration of the Tuan Chau – Co To route. Tuan Chau Express II, by contrast, later served Phan Thiet – Phu Quy as Chan Kha Phu Quy before returning to Quang Ninh. These are three distinct vessels and should not be confused when checking vessel history, photographs or identification numbers.

Current Operating Status

No complete, independently verified sailing schedule specifically assigned to Tuan Chau Express III is available for November 2026. This article therefore does not claim daily departures or publish a current fare for the vessel. Travellers to Co To should check the route timetable and confirm their assigned ferry before purchasing tickets.

This article provides technical and historical information about the vessel; it is not an operator’s current timetable.

Leave a Reply