Superdong V high-speed ferry, also known as Superdong 5, is a monohull passenger ferry operated by Superdong Fast Ferry Kien Giang Joint Stock Company. Built in Malaysia in 2012 and brought into service in early 2013, Superdong V has capacity for 275 passengers, a combined main-engine output of 1,518 kW and a published speed of 25 knots.
Having served the Rach Gia – Phu Quoc route and inter-island services in Nam Du, Superdong V has continued its journey on the Phu Quoc – Tho Chau route, connecting the Pearl Island with the outlying archipelago in southwestern Vietnam.
Introducing Superdong V high-speed ferry
Superdong V carries the designation V, the Roman numeral for 5, within Superdong’s passenger ferry fleet.
The vessel was built at Kaibuok Shipyard in Sarawak, Malaysia, which has built numerous high-speed ferries for the Vietnamese market.
According to the vessel’s identification records, Superdong V was completed in late 2012. It officially entered service on the Rach Gia – Phu Quoc route in January 2013.
Superdong V joined the fleet as the operator continued to expand its capacity to meet demand for passenger transport between the mainland and the islands of the southwestern seas.
Together with Superdong VI, which entered service in 2013, Superdong V added capacity on the Phu Quoc route, where demand for local travel and tourism is substantial.
Over the years, Superdong V has been reassigned to different routes. Since December 2025, the vessel has again been associated with the Phu Quoc – Tho Chau service, an important transport link for island communities.
Superdong V technical specifications
Superdong V is a monohull high-speed passenger ferry with an aluminium-alloy hull and main engines delivering a combined output of 1,518 kW.
| Item | Details |
|---|---|
| Official name | Superdong V |
| Alternative name | Superdong 5 |
| IMO number | 9693044 |
| Operator | Superdong Fast Ferry Kien Giang Joint Stock Company |
| Shipyard | Kaibuok Shipyard |
| Country of construction | Malaysia |
| Year built | 2012 |
| Entered service | January 2013 |
| Vessel type | Monohull high-speed passenger ferry |
| Hull material | Aluminium alloy |
| Length | Approximately 46 m |
| Beam | Approximately 6 m |
| Maximum capacity | 275 passengers |
| Main-engine output | 2 × 759 kW |
| Combined output | 1,518 kW |
| Speed in the 2025 Annual Report | 25 knots |
| Crew in the 2025 Annual Report | 10 people |
| Deadweight published in 2026 | 85 MT |
| Assigned route in the 2025 Annual Report | Phu Quoc – Tho Chau |
A speed of 25 knots is equivalent to approximately 46.3 km/h.
Actual operating speed also depends on the weather, sea conditions, load and maritime safety requirements.
For the Phu Quoc – Tho Chau route, the operator advertises a journey time of approximately 2 hours 30 minutes, depending on the weather.
Superdong V exterior design
Superdong V has the characteristic appearance of Superdong’s monohull high-speed ferries, with a white hull and decorative stripes in the brand’s colours.
The name SUPERDONG V is clearly displayed on the side of the vessel, distinguishing it from other ferries in the fleet.
The hull has an elongated profile, a projecting bow and rows of windows along its sides.
The aft section accommodates operational structures and maritime equipment.
Aluminium alloy is a relatively lightweight material widely used in the construction of high-speed vessels.
Superdong V’s monohull design differs from the twin-hull high-speed ferries used by Phu Quoc Express or Con Dao Express.
Each hull type has its own technical characteristics. The amount of movement experienced during a journey also depends on the actual sea conditions, rather than hull shape alone.
Passenger areas and facilities on Superdong V
With capacity for 275 passengers, Superdong V is designed for short to medium-length sea journeys.
Passenger cabin
The passenger space is arranged into seating areas with aisles for moving around the cabin.
Air conditioning and windows along the sides allow passengers to rest and enjoy views of the sea during the journey.
For crossings lasting approximately 2 hours 30 minutes, such as Phu Quoc – Tho Chau, packing luggage neatly and choosing a suitable seat can make the journey more convenient.
Seats and luggage
Passengers are assigned seats according to the seating plan and ticket details confirmed by the operator.
Groups and families should check their seating positions in advance to make it easier to care for young children and assist older passengers.
Personal luggage must be placed in designated areas without blocking aisles or emergency exits.
Passengers carrying motorcycles, bicycles or special cargo should ask the carrier about acceptance conditions in advance.
Safety equipment
Superdong V is equipped with maritime safety equipment and lifesaving appliances required for passenger vessel operations.
Before departure, passengers should pay attention to the crew’s instructions, particularly the location of life jackets and the procedures to follow in an emergency.
Do not enter restricted areas or go outside the cabin without permission while the vessel is accelerating, docking or operating in rough seas.
Superdong V route history
Superdong V has a notable operating history, having served several routes in the southwestern seas.
2013: Rach Gia – Phu Quoc
According to Superdong’s 2013 Annual Report, Superdong V entered service on the Rach Gia – Phu Quoc route in January 2013.
This is one of the important passenger sea routes connecting the mainland with Phu Quoc Island.
The addition of Superdong V increased the operator’s fleet and helped meet the travel needs of residents and tourists.
For many years, Superdong V formed part of the high-speed ferry network serving Phu Quoc.
2022: Superdong V serves Phu Quoc – Tho Chau
In September 2022, Superdong V began serving the Bai Vong – Tho Chau route under a transport contract to replace a vessel undergoing scheduled maintenance.
According to information published by Superdong, the ferry carried passengers and cargo between Phu Quoc and Tho Chau from 7 September to 24 November 2022, with the possibility of an extension depending on actual circumstances.
This was an important milestone, showing that Superdong V had experience on the sea route to Tho Chau before a regular high-speed service was introduced in later years.
2025: Connecting Hon Lon and Hon Ngang in Nam Du
In March 2025, Superdong announced an expansion of passenger transport between Hon Lon (An Son) and Hon Ngang in the Nam Du archipelago.
Superdong V, with its capacity for 275 passengers, was assigned to this inter-island route.
According to the schedule announced when the service opened, the ferry departed Hon Lon at 10:35 and returned from Hon Ngang at 11:00, with a journey time of only around 5 minutes.
Using Superdong V on the inter-island route helped meet demand for travel between inhabited islands and gave visitors another option for exploring Nam Du.
This information describes operations in 2025 and is not a confirmed current timetable for the inter-island route.
Late 2025: Returning to Phu Quoc – Tho Chau
On 22 December 2025, Superdong officially announced the opening of its high-speed ferry service between Phu Quoc and Tho Chau in both directions.
Superdong V was assigned to the service connecting the two island special administrative areas in An Giang Province.
The route improved travel connections and the transport of essential goods while meeting the needs of Tho Chau residents.
January 2026: Frequency increases to six sailings per week
From 19 January 2026, the frequency of the Phu Quoc – Tho Chau service increased to six sailings per week under a plan approved by the authorities.
On the 19 January 2026 sailing, Superdong V carried more than 250 passengers from Bai Vong Port to Tho Chau.
The crossing covers more than 60 nautical miles and takes approximately 2 hours 30 minutes.
This was another notable milestone for Superdong V as it continued to connect remote islands in the southwestern seas.
Superdong V on the Phu Quoc – Tho Chau route
The Phu Quoc – Tho Chau passenger route connects Phu Quoc Special Administrative Area with Tho Chau Special Administrative Area in An Giang Province.
The Tho Chau archipelago lies southwest of Phu Quoc, more than 100 km from the Pearl Island.
The high-speed ferry service makes travel between the two areas more convenient for residents while also supporting trade and cargo transport.
Departure port on Phu Quoc
Under the operating plan published in January 2026, Superdong V departs from Bai Vong Port, Phu Quoc Special Administrative Area, An Giang Province.
Passengers should check the exact departure port on their ticket before travelling to avoid confusing it with other ferry terminals on Phu Quoc.
Arrival port in Tho Chau
The ferry docks at Tho Chau Inland Waterway Port, serving residents and passengers who are permitted to visit the islands.
Tho Chau consists of several small islands. Tho Chu is the main island, where most residents and everyday activities are concentrated.
Because of the islands’ location and the requirements governing access to the area, passengers should check travel conditions carefully before booking.
Superdong V timetable to Tho Chau
According to the operating schedule announced from 19 January 2026:
| Route | Departure days | Published time |
|---|---|---|
| Phu Quoc – Tho Chau | Monday, Wednesday, Friday | 10:30 |
| Tho Chau – Phu Quoc | Tuesday, Thursday, Saturday | 08:00 |
The journey takes approximately 2 hours 30 minutes each way.
This was the timetable published when frequency increased in January 2026. Departure times, ports and assigned vessels may change according to the actual operating plan.
Passengers should confirm that their sailing is available for booking before travelling to the port.
Superdong V fares on Phu Quoc – Tho Chau
According to the fare table published by Superdong when the route opened in December 2025, indicative one-way fares are as follows:
| Passenger category | Indicative fare |
|---|---|
| Adults | VND 330,000 |
| Seniors aged 60 and over | VND 280,000 |
| Passengers with disabilities | VND 245,000 |
| Children aged 6–11 | VND 240,000 |
The published senior and disability fares are subject to the concession conditions applicable to Vietnamese citizens.
These are the fares at the time of publication and do not replace the price confirmed when purchasing a ticket for a specific departure date.
Passengers should check the policy for children under 6, special luggage, ticket changes or refunds, and any additional charges.
Can foreign visitors travel to Tho Chau on Superdong V?
This is an important consideration for the Phu Quoc – Tho Chau route.
According to the notice on Superdong’s online booking system, the Phu Quoc – Tho Chau route currently serves passengers with Vietnamese nationality only.
Foreign passengers should therefore avoid booking independently or travelling to the port before the relevant authorities and the operator have confirmed their eligibility to travel.
Vietnamese citizens must prepare valid identification, ensure that their ticket details match their documents, and follow the required port control procedures.
Exploring the Tho Chau archipelago
Tho Chau is an archipelago in southwestern Vietnamese waters comprising eight islands of different sizes.
It occupies an important position for transport, the marine economy and the lives of remote island communities.
Unlike Phu Quoc, Tho Chau has not developed a large-scale tourism infrastructure. Its character is closely associated with natural scenery, fishing livelihoods and community life.
Visitors eligible to travel to Tho Chau can learn about its coastal landscapes, fishing activities and island history.
As this is a maritime border area, sightseeing, accommodation and travel between the islands must comply with local regulations.
Before travelling, check accommodation arrangements, local transport and the ferry schedule back to Phu Quoc.
How does Superdong V differ from Superdong IV and Superdong VI?
Superdong IV, V and VI all belong to Superdong’s high-speed passenger fleet, but differ in capacity, entry-into-service dates and assigned routes.
| Feature | Superdong IV | Superdong V | Superdong VI |
|---|---|---|---|
| Year entered service | 2011 | 2013 | 2013 |
| Capacity | 306 passengers | 275 passengers | 275 passengers |
| Combined output | 2,080 kW | 1,518 kW | 1,518 kW |
| Speed published in 2025 | 27 knots | 25 knots | 25 knots |
| Assigned route in 2025 | Rach Gia – Lai Son – Nam Du | Phu Quoc – Tho Chau | Ha Tien – Phu Quoc |
Superdong V and Superdong VI share many characteristics in terms of capacity and engine output.
However, they are separate vessels with different designations and individual operating assignments.
A distinctive part of Superdong V’s recent history is its service on the Nam Du inter-island route in 2025 and its assignment to Phu Quoc – Tho Chau from late 2025.
What to check before travelling on Superdong V
Passengers should check the departure schedule, vessel name, departure port and destination in advance.
For Phu Quoc – Tho Chau, confirm travel eligibility and document requirements before buying a ticket. Arrive at the port early enough to complete formalities within the time required by the operator.
Prepare the personal items you need for a sea journey lasting approximately 2 hours 30 minutes.
Passengers prone to seasickness should prepare suitable preventive measures in advance.
Sailings may change or be suspended when weather conditions are unsafe. Avoid arranging very tight onward connections without a backup plan.
Passengers planning to stay in Tho Chau should confirm accommodation eligibility and the return sailing schedule beforehand.
Frequently asked questions about Superdong V
How many passengers can Superdong V carry?
Superdong V has a maximum capacity of 275 passengers, according to the 2025 Annual Report and information published by the authorities in 2026.
When was Superdong V built?
The vessel was built in Malaysia in 2012 and entered service in January 2013.
How fast is Superdong V?
The 2025 Annual Report gives a published speed of 25 knots, equivalent to approximately 46.3 km/h.
Does Superdong V operate between Phu Quoc and Tho Chau?
Yes. Superdong V was assigned to Phu Quoc – Tho Chau in the 2025 Annual Report, and its operation on the route was confirmed in information published in January 2026.
How long does Superdong V take from Phu Quoc to Tho Chau?
The published journey time is approximately 2 hours 30 minutes, depending on weather and operating conditions.
Has Superdong V operated in Nam Du?
Yes. In 2025, the operator assigned Superdong V to the Hon Lon – Hon Ngang inter-island route in the Nam Du archipelago.
Has Superdong V operated between Rach Gia and Phu Quoc?
Yes. This was one of its first routes when the vessel entered service in 2013.
Can foreign visitors book a ferry ticket to Tho Chau?
Superdong’s online booking system currently states that this route is only for passengers with Vietnamese nationality. Other cases require advance confirmation from the relevant authorities and the operator.
Superdong V: Connecting remote southwestern islands
From its Rach Gia – Phu Quoc sailings in 2013 to connections between Hon Lon and Hon Ngang and the Phu Quoc – Tho Chau route, Superdong V has passed through several notable stages of service.
With capacity for 275 passengers and main engines delivering 1,518 kW, the vessel continues to contribute to passenger sea transport.
In particular, Superdong V’s assignment to Tho Chau serves travel needs while improving connections between communities in the southwestern island region.
Explore the Superdong fleet, routes to Phu Quoc, Nam Du and Tho Chau, and booking information at TAUCAOTOC.VN.
