GreenlinesDP E10 is a high-speed twin-hull passenger ferry operated by GreenlinesDP (Green Technology DP Co., Ltd.). The operator has published a capacity of 145 passengers and a speed of 28 knots. The vessel was developed for passenger transport on waterways linking Ho Chi Minh City, Can Gio and Vung Tau.
With its relatively large passenger capacity, E10 forms part of GreenlinesDP’s efforts to develop river and coastal passenger transport in southern Vietnam.
GreenlinesDP E10 specifications
| Specification | Details |
|---|---|
| Vessel name | GreenlinesDP E10 |
| Operator | Green Technology DP Co., Ltd. (GreenlinesDP) |
| Vessel type | High-speed passenger catamaran |
| Hull material | Aluminium alloy |
| Reported shipbuilder | Shipyard 189, Vietnam |
| Passenger capacity in operator fleet profile | 145 |
| Published speed | 28 knots |
| Published operating area | Area IV |
| Routes mentioned in operator information | Ho Chi Minh City – Can Gio – Vung Tau |
These figures reflect published operator and fleet information. Permitted passenger numbers and operating conditions depend on the vessel’s current certificates and the operator’s sailing plan.
Design and passenger facilities
E10 has an aluminium twin-hull configuration, with white upper sections and dark blue lower hulls. The vessel’s name and GreenlinesDP branding appear along the side.
The catamaran structure provides a broad passenger area and can improve stability at speed. The enclosed passenger cabin is arranged with rows of seating, air conditioning and side windows for viewing the river scenery.
Features promoted across the GreenlinesDP fleet include comfortable seating, cooling systems, observation windows, maritime lifesaving equipment and, depending on configuration, entertainment and other passenger amenities. Facilities on a specific trip should be checked with the operator.
As with any fast ferry, passengers may still experience motion when waves or winds are strong.
Development and operating history
GreenlinesDP E10 was built as the company expanded its fleet of high-speed catamaran passenger vessels in southern Vietnam. The operator shared a video of the vessel’s launching ceremony in early 2018. E10 added capacity alongside other fleet members such as K6, K7, C8 and C9.
Ho Chi Minh City – Can Gio – Vung Tau
E10 has been introduced in connection with passenger transport linking Bach Dang Wharf, Can Gio and Vung Tau. The route offers an alternative to covering the whole journey by road between central Ho Chi Minh City and the Vung Tau coast.
Travel between Saigon and Vung Tau is commonly around two hours by fast ferry, subject to weather and the service operated. E10’s assignment to an individual sailing depends on GreenlinesDP’s actual vessel allocation.
Bach Dang – Binh Duong – Cu Chi river tourism
On 10 July 2020, GreenlinesDP and Ho Chi Minh City transport authorities launched a river tourism route between Bach Dang Wharf, Binh Duong and the Cu Chi Tunnels.
E10 was one of the vessels announced for the service, together with K6, K7 and C9. The approximately 78 km itinerary followed the Saigon River, connecting waterfront scenery with historical tourism sites. Such services broadened the city’s river-tourism offerings.
Schedules and ticket information
Passengers planning to travel by GreenlinesDP between Saigon and Vung Tau can check route information, departure schedules and fares at taucaotoc.vn.
Before booking, confirm the date, departure terminal, sailing time and passenger details. The vessel used may change, and this historical profile does not guarantee that E10 will operate a particular trip.
Other vessels in the GreenlinesDP fleet
The operator’s fleet has also included GreenlinesDP K6, K7, C8, C9 and the C3, C4 and C5 series. Their technical features, capacity and operating histories vary. More vessel guides are available in the Ferry Fleet section of taucaotoc.vn.

